On Monday, April 27, our team completed a major replacement of two large wet chemical kitchen hood fire suppression systems at a local sushi restaurant.
This was not a simple swap-out.
The existing systems had serious deficiencies. Two separate systems were protecting hazards connected through common ductwork and an ecology unit, but the systems were not set up to activate simultaneously. Under NFPA 96, systems protecting hoods that share common ductwork must activate together.
See pictures of previous systems below:




The Ecology Unit
The first problem with the existing systems, is that they were both installed on hoods sharing a common duct and a common ecology unit. Which according to NFPA 96, all systems sharing a common duct work are required to activate simultaneously (NFPA 96, 2017 10.3.1.1). The existing systems did not have that functionality, but this could have been added on.
The second problem, which warranted the system replacements, is that the upstairs system was also covering an ecology unit. NFPA 96 requires ecology units to be protected according to manufacturer recommendations, but when we called Badger/Kidde (manufacturers of existing systems), they told us that their system is not listed for use with these units. Which means that they did not test that the fire system will be able to put out a fire inside the unit.
Third problem, is that if we used another manufacturer's system for the ecology unit only, the systems would still need to be interconnected to activate simultaneously, to comply with NFPA standards. But upon discussing with the manufacturers, we found out that we would need a fire alarm releasing panel in between the systems for each of the systems to retain their individual listings. But they did state a disclaimer that they may not back up the installation (from either side) if a fire occurs, due to the fact that they did not test the chemicals to be mixed, or used together, on the same hazard (common ductwork).
Rather than create unnecessary liability for the client or our company, we decided to replace the systems with properly designed Buckeye Kitchen Mister systems, including dedicated protection for the hoods, ductwork, and ecology unit. See picture of ecology unit below. The unit takes up an entire room, is 12-15' long, 5-6' tall (suspended 3-4' above the ground), and is 5' deep. This unit is completely full of greasy filters and all inside walls are covered in kitchen grease, just to give you an idea of the hazard we're talking about.

We decided to quote Buckeye Kitchen Mister (KM) systems for this application. 1 x BFR-10 and 1 x BFR-20 cylinders for the main hood, 1 x BFR-15 cylinder for the small hood (upstairs) and 2 x BFR-15 cylinders for the ecology unit. A total of 5 cylinders. The 2 cylinders used for the ecology unit were connected to 17 nozzles inside the unit, plus extra nozzles covering the downstream ductwork (35 x 35 in size). Another key feature is that we installed heat detectors directly upstream and downstream of the unit, so that the system would activate if a fire occurred inside the unit. The previous installation did not have any detection installed in the unit itself. The system would only activate if there was a fire at the 8' kitchen hood.
The previous install only had pipe connection to 6 x quick seals on the unit, and nozzles were not found inside the unit, the quick seal connectors were found open, which means that chemical would have not been able to properly reach the hazard, due to the size of the orifice on the quick-seals (approximately 20-25 times the size of the orifice on a standard nozzle). This difference in orifice size would mean that the chemical would not spray out as designed (based on cylinder pressure, 175psi), and the discharge time would also be affected. Likely the previous installation did not have the required 5' long extension to reach the quick seals from inside the unit, for the nozzle installation portion. They went through the trouble of piping the quick-seals, but did not bother with the nozzle install. They signed off on the system, they walked away with the job half done. Our team did also review an invoice given to us by the client, from this other company, describing the coverage and price (it was very cheap).
Another contrast with the previous install is the amount of chemical available to suppress the fire. On the previous install, only 2.5 gallons of chemical were available, in contrast to 11.4 gallons with the new install. Almost 5 times more chemical! The sizing of the tanks is determined by the number of nozzles, as well as their rate of flow per minute (can be expressed in Liters/minute), but for the sake of ease, referred to as "flow point" in the system installation manual with unit increments of 1, or 0.5 for some systems. "15" in BFR-15, refers to "15 flow points available". In the case of the ecology unit, we had calculated a total flow point count of 27, which required two tanks, the biggest size available being the BFR-20 (approximately 7.6 gallons), so we opted for 2 x BFR-15, for ease of install and final aesthetic.
See pictures of final installation below

Cover photo: Upstairs system seen in this picture (this is also the system which covers the ecology unit). Light can be seen on, on the solenoid monitor (right side of control head), indicating that the system is live and armed. System gas valve also shown on right side of cylinder, connected to system to shut the gas in case of fire.




Electrical operation of fire suppression systems
During the design phase of this system (prior to quoting the work), we encountered some challenges. We needed a combination of mechanical detection as well as thermal detectors. We also needed simultaneous activation (as explained in previous section), which means we had to have system control heads that had a solenoid install and could operate electrically. The only choice we had was the SRME-120, which is a 120VAC control head, that can handle simultaneous activation (solenoid controlled), but can only handle thermal detection (electrical) and not mechanical. This meant we had to convert all the detection in the duct/plenum in all existing hoods to thermal detection. This required our electricians to wire up all the detectors across 30 feet of hood total, as well as the ecology unit, and to run a wire from main floor to upstairs. A total of 13 electrical thermal detectors ("Fenwals"). Quite a job for our electrical team!
The conditions we were looking for: If any thermal detectors reaches the set temperature (360 or 450F), both systems would activate simultaneously. Also if either pull station is pulled (manual activation pull handle), both systems would need to activate.
Job execution
The job had to be completed in one day because the restaurant could not afford an extended shutdown. Our team started at 6:00 AM and finished around 10:00 PM — a 16-hour push — but the client was able to open the next day with fully operational fire suppression protection in place.
There were challenges along the way: backordered parts arriving mid-install, unexpected electrical issues, a required access hatch that had to be cut and welded the same day, and even an unexpected fire alarm activation during the work.
But the job got done.
A huge thank you to the Defense Fire team: Chad Steeves, Daimler Nazareta, Matthew Cocks, and to the VA Electric team: Mario Vargas, Luis, and Felipe. Thank you to our suppliers as well, who worked hard to expedite the material for us. And lastly, thank you to our client, for choosing our company for the job!
This is the kind of project that shows why proper fire protection matters. It is not just about installing equipment — it is about understanding the hazard, the code requirements, the manufacturer listings, and the responsibility that comes with protecting a business.